Notice of Measures Satisfied – NOVA Gas Transmission Ltd. (NGTL) – Order No. JB-001-2024 and VAR-001-JB-001-2024

Notice of Measures Satisfied – NOVA Gas Transmission Ltd. (NGTL) – Order JB-001-2024 and VAR-001-JB-001-2024 [PDF 328 KB]

NOTICE OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Trevor Ebl, NOVA Gas Transmission Ltd. (NGTL) accountable officer, that the hazardous or detrimental situation described in Order No. JB-001-2024 and VAR-001-JB-001-2024 (IOOs):

  • The cause of the pipeline rupture had not yet been determined.
  • NGTL had not yet demonstrated that Grande Prairie Mainline NPS 36 (GPML) is fit for service at full Maximum Operating Pressure (MOP) following the rupture.

has been remedied for the GPML valve sections GPM80–70, GPM60–50, and GPM20–11.

On 3 November 2026, NGTL submitted the supporting Engineering Assessment #10502 (EA) to demonstrate that the GMPL valve sections GPM80–70, GPM60–50, and GPM20–11 are fit for service and can be returned safely to their licensed MOP of 8 270 kPa.

On 13 November 2026, CER staff met with NGTL to discuss their review comments and seek clarification on specific matters. Based on the information provided, CER staff were satisfied with NGTL’s demonstration.

Therefore,

  •  X The measures specified in the IOOs have been satisfied for the valve sections GPM80-70, GPM60-50, and GPM20-11. The remaining valve sections of the GPML will remain subject to the Restricted Operating Pressure (ROP), pursuant to the IOOs.
Inspection Officer
Inspection Officer 17 November 2026
Date
Information not available Information not available
IO Designation Number Signature
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA 2425-328 and INC2024-025

Date modified: