Steel Reef Pipelines Canada Corp. – Flat Lake Access Pipeline

Glenbow Ranch Provincial Park, Calgary, Alberta, Canada

REGDOCS Link

39266

Project Background

The purpose of the Flat Lake Access Pipeline (Project) is to transport unprocessed sour natural gas from an existing compressor station located in North Dakota and tie into Steel Reef’s existing Flat Lake Gas Plant near Oungre, Saskatchewan for further processing. The Project is intended to support reliable access to natural gas supply to maintain continued operations of Steel Reef’s existing Flat Lake Gas Plant and to meet market demands.

The Project includes the construction and operation of two parallel pipelines, each approximately 5 km in length in southeastern Saskatchewan. The pipelines will be utilized to import natural gas and export fuel gas. The Project will require approximately 20 metres (m) of permanent right of way and an additional 5m of temporary workspace, collectively referred to as the construction right-of-way.

Project construction is planned from June to September 2027.

Timeline and Documents

Contacts

Get Information

Land Matters Advisory Service
Canada Energy Regulator
Email: LMAS.SCQF@cer-rec.gc.ca
Telephone (toll free): 1-800-899-1265
Facsimile (toll free): 1-877-288-8803

Media Inquiries

Media Relations Team
Canada Energy Regulator
Email: media@cer-rec.gc.ca
Telephone (toll free): 1-800-899-1265

Date modified: